Post-Installation Verification Checklist
Inspection steps to perform after physical device installation.
- Verify supplied line voltage matches the product electrical label.
- Confirm the chassis earthing cable is permanently connected to earth ground.
- Verify that console and out-of-band management network cables are firmly seated.
- Confirm all system status LEDs (STAT, FAN, PWR, ALM) show green indicators upon booting.