Celestica Documentation Portal

Find your product documents here

Post-Installation Verification Checklist

Inspection steps to perform after physical device installation.

  1. Verify supplied line voltage matches the product electrical label.
  2. Confirm the chassis earthing cable is permanently connected to earth ground.
  3. Verify that console and out-of-band management network cables are firmly seated.
  4. Confirm all system status LEDs (STAT, FAN, PWR, ALM) show green indicators upon booting.