Celestica Documentation Portal

Find your product documents here

Rack Mounting the DS1000

Procedure to mount the chassis into a standard 4-post 19-inch square-hole rack using the slide rail kit.

Required tools: Torx screwdriver, Phillips head screwdriver, Flat-blade screwdriver, 8x M6 cage nuts, 8x M4 outer rail screws, and 4x M6 rack screws. Requires two technicians to lift and align chassis.

  1. Attach outer rails to the switch chassis using four M4 screws per side, ensuring holes are aligned and centered.
    Figure 1.

    Figure 2.

  2. Install eight M6 cage nuts into the 19-inch rack posts at the exact same horizontal height (2 per post).
    Figure 3.

  3. Mount the inner rail assemblies to the rear rack posts using M6 screws and align the rear guide pin.
    Figure 4.

  4. With two persons lifting the switch, align and carefully slide the chassis outer rails into the rack inner rails via the U-grooves.
    Figure 5.

  5. Secure the front mounting ears to the cage nuts using two M6 screws per side, verifying that the unit is completely level and secure.
    Figure 6.